Toronto, Ontario–(Newsfile Corp. – September 15, 2023) – Gowest Gold Ltd. (TSXV: GWA) (“Gowest” or the “Corporation“) is pleased to announce initial assay results from Phase 1 of its previously announced surface diamond drill program at its 100% owned Bradshaw Gold Mine (Bradshaw.) This first 5,000-metre program phase is part of a larger planned program that aims to expand the mineable resource at Bradshaw, as well as to further test other parts of the Corporation’s North Timmins Gold Project (“NTGP“) area where notable gold has previously been intercepted (see Gowest news releases dated June 26, 2023, June 1, 2020, and June 27, 2019).
Diamond Drilling Highlights
-
Results received by Sept. 1st from the first seven diamond drill holes, all of which intersected gold mineralization
-
A total of 2,255 m of drilling has been completed as of Aug 31, including ten completed holes and one in progress (Table 2.)
-
Highest intercept: 10.64 g/t Au over 2.6 m from hole GW23-321, including 16.67 g/t Au over 1.5 m from the Bradshaw HAN zone
-
Drilling on the HW2 zone also returned significant gold mineralization of 3.12 g/t Au over 1.8 m in Hole GW23-320 and 2.71 g/t Au over 5.0 m (including 3.27 g/t Au over 2.50 m) in Hole GW23-324.
-
Hole GW23-326 intersected 3.48 g/t Au over 2.0 m in the HW4 Bradshaw Zone.
Dan Gagnon, President and Chief Executive Officer of Gowest, commented, “These positive initial drill results continue to support our team’s expectation that we will be able to expand our current mineable resources and reserves at Bradshaw. At the same time, the mine restart is progressing very well. We remain on target on all fronts, including all production and key infrastructure programs, and anticipate starting the toll milling our ore at the Redstone Mill in the fourth quarter of this year.”
Overview:
The Phase 1 and 2 surface drilling program, which is expected to be completed in November, has progressed well since it commenced on June 20. A total of 2,255 m of drilling has been completed as of Aug 31, consisting of ten holes completed and one in progress (Table 2.)
The ten holes were drilled on the eastern portion of the Bradshaw Gold Deposit (see Table 2). This work represents the initial phase of a 5,000-m surface drill program. This phase is targeting the OB1, HAN, HW4, HW2 gold zones below the 80 m mine level, to extend existing stopes. (See Figure 1 and Table 1 below, as well as Gowest news release dated July 11, 2023).
The drill rig is currently drilling the eleventh hole (GW23-330) and an additional three holes have been spotted in the field (2,056 m).
Two exploration permit applications submitted to the Ontario Ministry of Mines in May were approved in August. The permits are valid for three years and will allow diamond drilling of the west and east Bradshaw gold deposit strike extensions, the Sheridan Gold Zone area, the Dowe Gold Zone area and the Roussain Gold Zone.
Figure 1: Phase 1 drilling targeted the northeast and southwest trending veins of Bradshaw deposit, following the immediate south-southwest down plunge of mineable ore shots.
Bradshaw Underground Mine Longitudinal Section Looking North
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4591/180704_2853b85ca4e10858_001full.jpg
Table 1: Gold intersections (all Au intercepts are reported in core lengths and may not be indicative of the true width)
HOLE ID | From (m) | To (m) | Length (m) | Au (g/t) |
GW23-320 | 65.00 | 66.50 | 1.50 | 2.24 |
and | 105.00 | 106.00 | 1.00 | 2.91 |
and | 114.00 | 117.00 | 3.00 | 2.19 |
and | 118.50 | 120.00 | 1.50 | 0.99 |
and | 145.50 | 147.30 | 1.80 | 3.12 |
Includes | 146.30 | 146.80 | 0.50 | 11.10 |
GW23-321 | 97.50 | 102.40 | 4.90 | 1.49 |
and | 139.00 | 141.60 | 2.60 | 10.64 |
includes | 140.10 | 141.60 | 1.50 | 16.67 |
and | 150.70 | 151.90 | 1.20 | 1.45 |
and | 169.00 | 170.00 | 1.00 | 1.18 |
174.00 | 175.00 | 1.00 | 1.46 | |
GW23-324 | 121.50 | 126.50 | 5.00 | 2.71 |
includes | 124.00 | 126.50 | 2.50 | 3.27 |
GW23-322 | 105.00 | 106.00 | 1.00 | 3.04 |
and | 150.00 | 151.00 | 1.00 | 1.90 |
and | 159.00 | 160.00 | 1.00 | 1.70 |
GW23-323 | 83.60 | 84.50 | 0.90 | 2.49 |
165.00 | 166.00 | 1.00 | 3.03 | |
176.50 | 182.00 | 3.50 | 1.02 | |
GW23-325 | 22.90 | 23.80 | 0.90 | 1.73 |
104.00 | 105.40 | 1.40 | 1.81 | |
124.00 | 125.00 | 1.00 | 2.42 | |
137.00 | 138.00 | 1.00 | 1.22 | |
GW23-326 | 41.00 | 43.00 | 2.00 | 3.48 |
Technical details:
Previous studies have stated that “Gold mineralization at the Bradshaw Deposit occurs in an interlayered, steeply dipping and west‐southwest trending sequence of mafic volcanic rocks and ultramafic rocks of the Kidd‐Munro Assemblage. A potentially tectonically interleaved sequence of ultramafic rocks and turbidite sediments occurs to the Assemblage or represent interflow units within the Kidd Munro Assemblage; they have common pyrite nodules. The hosting mafic unit to the mineralization is 100‐140 meters thick. The localization of veins in this unit likely reflects its more competent nature than the surrounding weaker ultramafic and sedimentary rocks and is typical of the thickness of ore‐hosting mafic units at other deposits in the area, such as the Aunor‐Delnite deposit in Timmins, which is also bounded by ultramafic units.”
Mineralization at Bradshaw occurs in association with shear vein breccia containing quartz/carbonate/albite/sericite/tourmaline/sulphide. Vein network have a rhombic pattern and hosted within a mafic volcanic unit.
Table 2: Drill Holes
Drill Hole | Easting | Northing | Elevation | Azimuth | Dip | Length |
(No.) | (Nad 83 m) | (Nad 83 m) | (masl) | (°) | (°) | (m) |
GW23-320 | 486975 | 5398769 | 291 | 204 | -49 | 230 |
GW23-321 | 486975 | 5398769 | 291 | 190 | -53 | 185 |
GW23-322 | 486983 | 5398768 | 291 | 177 | -54 | 174 |
GW23-323A | 486983 | 5398768 | 291 | 186 | -60 | 197 |
GW23-323 | 486983 | 5398768 | 291 | 186 | -60 | 15 |
GW23-324 | 487020 | 5398765 | 291 | 180 | -46 | 133 |
GW23-325 | 487020 | 5398765 | 291 | 178 | -54 | 152 |
GW23-326 | 487075 | 5398719 | 290 | 180 | -55 | 58 |
GW23-327 | 486791 | 5398841 | 290 | 165 | -63 | 332 |
GW23-328 | 486736 | 5398798 | 290 | 172 | -60 | 300 |
GW23-329 | 486794 | 5398891 | 290 | 177 | -59 | 378 |
Quality Control Procedures
NQ drill core is oriented and cut with half sent to Activation Laboratories Timmins (Actlabs) for drying and crushing to -2 mm, with a riffle split 250g and pulverize (mild steel) to 95% passing 105μm (150 mesh). Actlabs is an ISO 17025 accredited laboratory. A 30 g charge is Fire Assayed and analyzed using an AAS finish for Gold. Samples above 10.00 g/t Au are analyzed by Fire Assay with a gravimetric finish and selected samples with visible gold by Metallic Screen Fire Assay on a 1.00 kg sample. Gowest inserts independent certified reference material and blanks with the samples and assays routine pulp repeats, as well as completing routine third-party check assays at a third-party laboratory.
About Gowest
Gowest is a Canadian gold exploration and development company focused on the delineation and development of its 100% owned Bradshaw Gold Deposit (Bradshaw) on the Frankfield Property, part of the Corporation’s North Timmins Gold Project (NTGP). Gowest is exploring additional gold targets on its +100‐square‐kilometre NTGP land package and continues to evaluate the area, which is part of the prolific Timmins, Ontario gold camp. Currently, Bradshaw contains a National Instrument 43‐101 Indicated Resource estimated at 2.1 million tonnes (“t”) grading 6.19 grams per tonne gold (g/t Au) containing 422 thousand ounces (oz) Au and an Inferred Resource of 3.6 million t grading 6.47 g/t Au containing 755 thousand oz Au. Further, based on the Pre‐Feasibility Study produced by Stantec Mining and announced on June 9, 2015, Bradshaw contains Mineral Reserves (Mineral Resources are inclusive of Mineral Reserves) in the probable category, using a 3 g/t Au cut‐off and utilizing a gold price of US$1,200 / oz, totaling 1.8 million t grading 4.82 g/t Au for 277 thousand oz Au.
Qualified Person
The technical information in this news release has been reviewed and approved by Even Stavre, P.Geo., Gowest’s Chief Geologist, who is the Qualified Person for the technical information in this news release under National Instrument 43-101 standards.
Forward-Looking Statements
Certain statements in this release constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements in this press release include, without limitation, statements relating to the use of the proceeds of the Offerings, the potential for to raise additional proceeds from the exercise of Warrants, and the proposed activities of the Corporation at Bradshaw. Words such as “may”, “would”, “could”, “should”, “will”, “anticipate”, “believe”, “plan”, “expect”, “intend”, “potential” and similar expressions may be used to identify these forward-looking statements although not all forward-looking statements contain such words.
Forward-looking statements involve significant risks, uncertainties and assumptions. Many factors could cause actual results, performance or achievements to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements, including those risk factors set forth in the Corporation’s management’s discussion and analysis and other filings available via the System for Electronic Document Analysis and Retrieval (SEDAR) under the Corporation’s profile at www.sedar.com. Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking statements prove incorrect, actual results, performance or achievements may vary materially from those expressed or implied by this press release. These factors should be considered carefully, and readers should not place undue reliance on the forward-looking statements. These forward-looking statements are made as of the date of this press release and, other than as required by law, the Corporation does not intend to or assume any obligation to update or revise these forward-looking statements, whether as a result of new information, future events or otherwise.
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
For further information please contact:
Dan Gagnon
President & CEO
Tel: (416) 363-1210
Email: [email protected]
Greg Taylor
Investor Relations
Tel: (416) 605-5120
Email: [email protected]
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/180704