Amended PFS Technical Report

This “Amended National Instrument 43-101 Technical Report and Prefeasibility Study” (the “Report”) has been completed for its 100% owned Bradshaw Gold deposit (“Bradshaw”), part of the larger North Timmins Gold Project. The Prefeasibility Study (“PFS”) and the Report were completed by Stantec Mining (“Stantec”) through their Mississauga, Ontario office. The PFS was focused on mining the upper 500 vertical meters (“m”) of mineralization at Bradshaw. Previous drilling has intercepted mineralization at a vertical depth of 1,350 m, indicating the deposit remains open for additional development. The Report has been broken into two parts for faster downloading. The full Report is also available with the Company’s other documents at SEDAR.com.